MEERA CENTRUM
Drilling Sequence Optimization
in the Middle East
Challenges
Solutions
OUTCOME
Accurate production forecast and excellent alignment with the observed data in the history and the blind test period
A multi-cluster drilling sequence model is constructed and connected to the client databases to fetch the updated information
Hierarchical access granted to different users to import required data and observed/update the optimization parameters
Optimized well drilling sequence generated which could be updated in minutes based on newly available data/constraint
Live rig location and schedule tracking
Pre-drill, while-drilling, and post-drill activity tracking
Using MEERA CENTRUM unique feature, the operator can estimate the expected profit from resolving each constraint and thus, can make informed decisions about extra investments such as increasing/decreasing the number of drilling rigs.
A multi-cluster drilling sequence model is constructed and connected to the client databases to fetch the updated information
Hierarchical access granted to different users to import required data and observed/update the optimization parameters
Optimized well drilling sequence generated which could be updated in minutes based on newly available data/constraint
Live rig location and schedule tracking
Pre-drill, while-drilling, and post-drill activity tracking
Using MEERA CENTRUM unique feature, the operator can estimate the expected profit from resolving each constraint and thus, can make informed decisions about extra investments such as increasing/decreasing the number of drilling rigs.
Client Return on Investment:
Significant improvement in oil production acceleration and recovery
Significant improvement
in oil production acceleration
and recovery
18% Cost Saving
by minimizing the rig move
and idle time
24% Improvement
in the annual production for the entire
division in 2023
18% Improvement
in the annual production for
the entire division in 2024
7% Improvement
in the annual production for the
entire division in 2025-2027